How to set a site's service capacity
Tell EVpin how many amps the utility or building service can supply, from the point of connection on the Design page.
By the end your design will record the size of the service that feeds the site, in amps. You need a design with electrical design turned on and a point of connection, as in How to add a point of connection.
Click the service size
Under Standard service sizes, click what the utility or building service can supply. Scroll the list for the larger sizes.

What's next
- How to check a design's load calculation to compare the chargers' load with the service.


